{“dynamic”:true,”content”:”post_title”,”settings”:{“before”:””,”after”:””}}

{“dynamic”:true,”content”:”post_excerpt”,”settings”:{“before”:””,”after”:””,”words”:””,”read_more_label”:””}}

{“dynamic”:true,”content”:”custom_meta_client”,”settings”:{“before”:”Client: “,”after”:””,”enable_html”:”on”}}

{“dynamic”:true,”content”:”custom_meta_address”,”settings”:{“before”:”Address: “,”after”:””,”enable_html”:”on”}}

{“dynamic”:true,”content”:”custom_meta_construction-contract”,”settings”:{“before”:”Construction Contract: “,”after”:””,”enable_html”:”on”}}

About this Project

This project involved the construction of a completely new Town Highway Garage and renovation of the existing structure giving the appearance that it is all completely new. The project included site preparation, drainage and blacktopping.

Highlights

  • Erection of a new pre-engineered metal building
  • Renovation of existing per engineered metal building
  • Polished concrete floor in office area
  • Construction of 4 new drive through bays
  • Construction renovation of existing 3 bays
  • Construction of a new meeting room
  • Construction of a new break room
  • Construction of new bathroom facilities
  • Construction of new supervisory office space
  • Construction of a site to house an emergency generator to serve the new garage
  • Radiant heat in concrete slab
[smartslider3 slider=8]